CLIENT |
LOCATION |
DESCRIPTION |
MONSANTO PREMIER KASAI |
MAP TA PHUT |
CONSTRUCTION COMPLETION, FULL
COMMISION , TEST RUNNING OF THE PLANT WHICH INCLUDED PIPING
BOTH C/S AND S/S FABRICATION AND MODIFICATION INSTALLATION
OF EXTRUDERS AND ROTING EQUIPMENT. |
LOXLEY C.S.R. |
HEMERAJ INDUSTRIAL |
FABRICATE AND INSTALL STEEL
WORK ( 220 TONNERS ) FOR BAGHOUSE STRUCTURE |
ABB CONTRACTING LTD. |
THAIOIL SRIRACHA |
THE FABRICATION AND INSTALLATION
OF 10 " SCHEDULE 160
CHROME / MOLY HIGH PRESSURE STEAM PIPE LINE, ( APPROX 9,000
DIA INCHES ) FOR THAI OIL REFINERY |
LOXLEY C.S.R. |
HEMERAJ INDUSTRIAL |
FILTER PLATFORM AND TANK |
LOXLEY C.S.R. |
HEMERAJ INDUSTRIAL |
BURNER ACCESS PLATFORM AND EXHAUST DUCT |
OZCON (THAILAND)CO.,LTD |
BANGKOK |
SPIRAL STAIRCASE ( FABRICATION AND ERECTION ) |
ACS ASIA CO.,LTD. |
HONGKOKG |
STRUCTURAL STEEL PIPE SUPPORT ( 65 TONNES ) |
ACS ASIA CO.,LTD. |
HONGKOKG |
STRUCTURAL STEEL WORK ( 115 TONNES ) |
McCONNELL DOWELL |
AYUTHAYA |
PROCESS PIPING FABRICATION AND
INSTALLATION FOR THAI FERTILIZER PROJECT. |
TYCO |
BO-WIN |
PROCESS PIPE FABRICATION AND
INSTALLATION ON KELLOGS PROJECT. |
MORRISON KNUDSEN |
BO-WIN |
G.M, TOWER |
E.P.C. |
MAP TA PHUT |
LIGHNING MASTS & CONTROL
STATION |
GENERAL MOTORS |
BO-WIN |
THE INSTALLATION OF ELECTRICAL
UTILIES SYSTEM AND TRANSFORMERS AT THE GENERAL MOTORS PLANT. |
ABB T.P.I. |
MAP TA PHUT |
SUPPLY MANPOWER / STEEL STRUCTURE |
T.P.I. |
MAP TA PHUT |
THE FABRICATION, INSTALLATION
AND TESTING OF STEAM PIPING FOR BOILERS. |
SINO - THAI |
BO-WIN |
STRUCTURAL STEEL WORK ( 660
TONNES ) ( SHOP DRAWING, FABRICATION AND RECTION ) |
THAI GAMMON |
MAP TA PHUT |
STRUCTURAL STEEL WORK 2 ( 250
TONNES ) ( FABRICATION AND ERECTION ) |
GENERAL MOTORS |
BO-WIN |
OFFICE CONTAINER ( 24M x 12M ) |
H.C. STARCK |
MAP TA PHUT |
STEEL WORK ( 650 TONNES ) |
H.C. STARCK |
MAP TA PHUT |
THE INSTALLATION OF FILTER PRESSES,
TANKS, HEAT EXCHANGERS AND PUMPS. |
H.C. STARCK |
MAP TA PHUT |
THE FABRICATION, INSTALLATION
AND TESTING OF PROCESS PIPING BOTH S/S AND C/S ( LARGE BORE
AND SMALL BORE ) |
McCONNELL DOWELL |
MAP TA PHUT |
STORAGE TANK WORK ( 100 TONNES ) |
McCONNELL DOWELL |
MAP TA PHUT |
STRUCTURAL STEEL WORK ( 500
TONNES ) ( SHOP DRAWING AND FABRICATION ) |
RAYONG OLEFINS |
MAP TA PHUT |
24 " VERTICAL STRAINER |
BROWN & ROOT |
BO-WIN |
EXTRUDER INSTALLATION, PIPE
FABRICATION, PIPE INSTALLATION FOR MBJ PROJECT |
MBJ ADVANCED POLYMERS |
BO-WIN |
MAINTENANCE CONTRACT |
ICI ASIATIC CHEMICAL |
BANGPOO |
COOLING WATER PIPE |
ICI ASIATIC CHEMICAL |
BANGPOO |
STEEL FABRICATION OF PLATFORM |
INGERSOLL - DRESSER PUMPS |
MAP TA PHUT |
PROVIDE MOTOR STARTER PANELS
FOR THE NEW SEAL WATER PUMP |
VINYTHAI PUBLIC CO.,LTD. |
MAP TA PHUT |
MODIFICATION PIPING WORK |
TPC |
MAP TA PHUT |
REMOVAL AND INSTALLATION OF
7" SS PIPE |
CHEVRON OFFSHORE (THAILAND) LTD. |
OFFSHORE & ONSHORE |
2 UNITS OFF PROCESS WYE SKID
CONDUCTOR GUIDE SLING PLATFORM FLASH WATER TREATMENT MODULE
PLATFORMS MODIFICATION & MUDMAT
INSTALLATION |
DARAMIC (THAILAND) LTD. |
304 INDUSTRIAL ESTATE, PRAJINBURI |
PIPING PROCUREMENT, FABRICATION, INSTALLATION
INSULATION AND COMISSIONING |
UNOCAL CLOUGH AND UNITHAI ALLIANCE |
LAEMCHABANG |
BOATLANDING PLATFORM
PHASE # 22, 23 MUDMAT PHASE # 22, 23 CASSING GUIDE PHASE #23
RISER CLAMP 10", 16" WITH
NEOPRENE RUBBER MISCELLANEOUS PLATFORMS I.E. CRANE
BOOM REST, CRANE ACCESS PLATFORM, INSTRUMENT TUBING, ETC. PHASE
#22, 23 60 T X 40 METERS LONG PIPE BRIDGE PLOCPP PIPING FABRICATION |
RIECKERMANN |
MINBURI, BANGKOK |
COFFEE OIL & AROMA TANK |
BAFS |
SAMUI AIRPORT, SURATTHANEE |
SAMUI FUEL STATION |
WESTSIDE |
RAYONG BULK TERMINAL, MAB TA PHUT |
BWA PIPING MANIFOLD |
CHEVRON (THAILAND) LTD. |
SATTAHIP, CHONBURI |
TRANSPORTATION BASKET |
RPT ASIA LIMITED |
EASTERN SEABOARD, PLUAKDAENG, RAYONG |
SUPPLY OF ROLLER / GLASS MOLD |
TIG |
MAP TA PHUT |
HyCO GAS PLANT |
CHEVRON (THAILAND) LTD. |
SATTAHIP |
SUB SEA SPOOL FABRICATION |
CLIENT |
LOCATION |
DESCRIPTION |
TIG Hy CO LTD. |
MAP TA PHUT |
PIPING AND STRUCTURAL STEEL FABRICATION, ON SITE ERECTION
OF PIPING, STRUCTURAL STEEL, EQUIPMENT INSTALLATION, BOILER HOUSE,
COMPRESSOR HOUSES, AND INCLUDING OF INSULATION WORK, PAINTING WORK,
HYDROTEST AND MANPOWER SUPPLY FOR COMMISSIONING. |
CHEVRON OFFSHORE THAILAND |
MAP TA PHUT |
OFFSHORE OFFICE SUPPLY AND CONSTRUCTION TO FIRE RATE
A-60 SPECIFICATION |
CHEVRON OFFSHORE THAILAND |
MAP TA PHUT |
OFFSHORE DECK PLATFORM TOTAL WEIGHT 25 TONS
WITH NON-SLIP COATING |
CUEL |
LAEM CHA BANG |
14 UNITS OF RISER GUIDE CLAMS TOTAL WEIGHT 20 TONS |
CUEL |
LAEM CHA BANG |
PIPE SPOOL FABRICATION (HAZIRA PLATFORM) |
CUEL |
LAEM CHA BANG |
STRUCTURAL STEEL WORK FAABRICATION ( HAZIRA PLATFORM) |
AMERICAN TITAN |
MAP TA PHUT |
FABRICATION OF CRANE PEDESTALS (UNOCAL PLATFORM) |