The following references included in this section can be validated upon request.

TIG HyCO
TIG HyCO LIMITED

10 March 2003

Letter of Acknowledgement

To whom it may concern,
this is to confirm that the company. Ultimate Technology & Service, (company director, Mr. John Richardson) was the main mechanical contractor during the construction of the TIG HyCO, 1900NM3/H Carbonmonoxide/Hydrogen syngas plant,- Map-Ta-Phut-Thailand.

The duration of the contract was from July 2002 until May 2003.

The scope of the contract consisted of:

  1. Fabrication & Erection of Structural Steelwork,
  2. Fabrication & Installation of Process Piping,
  3. Installation of all Mechanical Equipment (vessels & rotating equipment),
  4. Pressure Testing & Reinstatement of all Piping System,
  5. Shop & Field Painting of Steelwork & Piping,
  6. Insulation of all Piping System,
  7. Overall Quality Control for the fore-mentioned work,
  8. Assistance for commissioning, in the form of labour, supervision, tools & materials.

During this UTS performed their scope of work in totally a professional and timely manner to the effect impressing both TIG & Linde Engineering Management.

I would like to thank UTS for their efforts in making this a successful project.

In conclusion, I would have no hesitation in recommending UTS to future clients.

Regards

Colin Miller - TIG HyCO construction site manager.

 

top

LINDE AG Linde Engineering Division

 

To whom it may concern

Letter of Recommendation for UTS

Bangkok, 12 February 2003

Subj. Tig HyCO synthesis gas plant in Map Ta Phut

Dear Sirs,

Linde AG, Engineering Division, a German "blue chip" shareholding company, would like to highly recommend UTS = Ultimate Technology Services, a company run by Mr. John Richardson, Pracharat Road, Map Ta Phut.

UTS in 2002 and early 2003 was responsible for the mechanical Installation of the TIG HyCO plant, located in Map Ta Phut. The design, engineering and equipment were supplied by Linde. UTS independently performed an excellent job, including fabrication of piping and steel structure, mechanical installation of equipment, pressure test, re-instatement ant quality control.

We were very impressed by the high quality of UTS fabrication and services as well as their commitment to supply all equipment and work within schedule.

Linde was fully satisfied with all aspects of UTS services and we would like to highly recommend UTS to all future prospective UTS.

We would like here with express our many thanks to UTS and wish UTS further success and prosperity.

With best regards,

Goetz Kassing
General Manager

 

top

Clough - Unithai
Engineering Limited

8 March 2001

To Whom It May Concern

Clough-Unithai Engineering Limited (CUEL) are Alliance Partners with Unocal Thailand Ltd

The UCU Alliance (Unocal - Clough - Unithai) partners have signed agreements to work together for an initial period of 7 years. UCU Alliance will engineer, procure, fabricate and install all Unocal Wellhead Platforms and associated Sub-sea Pipelines in Gulf of Thailand during that period.

UCU Alliance is presently being tailored to provide similar fabrication services to other Operators in the Gulf of Thailand.

Ultimate Technology and Services (UTS) have been listed as a preferred contractor to UCU, having recently being awarded several major fabrication and piping subcontractor packages.

Given the success of UTS involvement to date i.e. Schedule, Quality and Safety on Phase 22 of the Unocal Project. UCU and UTS will look forward to a long close working relationship during Phase 23 and subsequent Phase.

Should future projects at our Laem Chabang Facility require the need for similar outsourcing. We would have no hesitation in entering further subcontracting arrangement with UTS.

Your faithfully,
Clough-Unithai Engineering Limited

J.M.Watt
Construction Manager

 

top

HBR (Thailand) Limited

 

27 May 1999

Ultimate Technology Services Co.,Ltd

Attention: Mr. John Richardson

Subject: MBJ Subcontract Works
Mechanical Piping, Structural Electrical and Instrumentation

Kellogg Brown & Root would like to express our gratitude and appreciation for the professional approach this project to a successful conclusion. It is not only ourselves who commend the quality of your staff but also our client MBJ Polymers. Again we thank you and look forward to continuing this relationship in the future.

If your prospective clients require references of any description do not hesitate to contact the undersigned.

Best regards

Ron Metcalf
General Manager


top

Morrison Knudsen (Thailand) Ltd

Date: 16 March 1998

 

 

To Whom It May Concern

 

Ultimate Technology Services Co.,Ltd. has successfully completed several project at the General Motors Plant site in the Eastern Seaboard Industrial Estate.

Including:
- Fabrication and Erection of temporary office complete,
- Install Temporary Utilities for office and plant site construction phase,
- Fabricate and Erect 600 tons of structural steel for Utility Building.

A high recommendation goes to Ultimate Technology Services Co.,Ltd for their performance on this project and hopefully we can use UTS for future work.

 

Doug Wilson
Site Co-ordinator