Reference
The following references included in this section can be
validated upon request.
TIG HyCO |
TIG HyCO LIMITED |
10 March 2003
Letter of Acknowledgement
To whom it may concern,
this is to confirm that the company. Ultimate Technology & Service,
(company director, Mr. John Richardson) was the main
mechanical contractor during the construction of the
TIG HyCO, 1900NM3/H Carbonmonoxide/Hydrogen syngas plant,-
Map-Ta-Phut-Thailand.
The duration of the contract was from July 2002 until
May 2003.
The scope of the contract consisted of:
- Fabrication & Erection of
Structural Steelwork,
- Fabrication & Installation
of Process Piping,
- Installation of all Mechanical
Equipment (vessels & rotating
equipment),
- Pressure Testing & Reinstatement
of all Piping System,
- Shop & Field Painting of Steelwork & Piping,
- Insulation of all Piping System,
- Overall Quality Control for the fore-mentioned
work,
- Assistance for commissioning,
in the form of labour, supervision, tools & materials.
During this UTS performed their scope of work in totally
a professional and timely manner to the effect impressing
both TIG & Linde Engineering Management.
I would like to thank UTS for their efforts in making
this a successful project.
In conclusion, I would have no hesitation in recommending
UTS to future clients.
Regards
Colin Miller - TIG HyCO construction site manager.
|
top
|
LINDE
AG Linde Engineering Division |
|
To whom it may concern
Letter of Recommendation for UTS
Bangkok, 12 February 2003
Subj. Tig HyCO synthesis gas plant in Map Ta Phut
Dear Sirs,
Linde AG, Engineering Division, a German "blue
chip" shareholding company, would like to highly
recommend UTS = Ultimate Technology Services, a company
run by Mr. John Richardson, Pracharat Road, Map Ta
Phut.
UTS in 2002 and early 2003 was responsible for the
mechanical Installation of the TIG HyCO plant, located
in Map Ta Phut. The design, engineering and equipment
were supplied by Linde. UTS independently performed
an excellent job, including fabrication of piping and
steel structure, mechanical installation of equipment,
pressure test, re-instatement ant quality control.
We were very impressed by the high quality of UTS
fabrication and services as well as their commitment
to supply all equipment and work within schedule.
Linde was fully satisfied with all aspects of UTS
services and we would like to highly recommend UTS
to all future prospective UTS.
We would like here with
express our many thanks to UTS and wish UTS further
success and prosperity.
With best regards,
Goetz Kassing
General Manager
|
top
|
|
Clough
- Unithai
Engineering
Limited |
|
8 March 2001
To Whom It May Concern
Clough-Unithai Engineering Limited (CUEL) are Alliance
Partners with Unocal Thailand Ltd
The UCU Alliance (Unocal - Clough - Unithai) partners
have signed agreements to work together for an initial
period of 7 years. UCU Alliance will engineer, procure,
fabricate and install all Unocal Wellhead Platforms
and associated Sub-sea Pipelines in Gulf of Thailand
during that period.
UCU Alliance is presently being tailored to provide
similar fabrication services to other Operators in
the Gulf of Thailand.
Ultimate Technology and Services (UTS) have been listed
as a preferred contractor to UCU, having recently being
awarded several major fabrication and piping subcontractor
packages.
Given the success of UTS involvement to date i.e.
Schedule, Quality and Safety on Phase 22 of the Unocal
Project. UCU and UTS will look forward to a long close
working relationship during Phase 23 and subsequent
Phase.
Should future projects at our Laem Chabang Facility
require the need for similar outsourcing. We would
have no hesitation in entering further subcontracting
arrangement with UTS.
Your faithfully,
Clough-Unithai Engineering Limited
J.M.Watt
Construction Manager
|
top
|
|
27 May 1999
Ultimate Technology Services Co.,Ltd
Attention: Mr. John Richardson
Subject: MBJ Subcontract Works
Mechanical Piping, Structural Electrical and Instrumentation
Kellogg Brown & Root would like to express our
gratitude and appreciation for the professional approach
this project to a successful conclusion. It is not
only ourselves who commend the quality of your staff
but also our client MBJ Polymers. Again we thank you
and look forward to continuing this relationship in
the future.
If your prospective clients require references of
any description do not hesitate to contact the undersigned.
Best regards
Ron Metcalf
General Manager
|
top
|
|
Morrison
Knudsen (Thailand) Ltd |
Date: 16 March 1998
To Whom It May Concern
Ultimate Technology Services Co.,Ltd. has successfully
completed several project at the General Motors Plant
site in the Eastern Seaboard Industrial Estate.
Including: |
- Fabrication
and Erection of temporary office complete,
- Install Temporary Utilities for office and plant site construction phase,
- Fabricate and Erect 600 tons of structural steel for Utility Building. |
A high recommendation goes to Ultimate
Technology Services Co.,Ltd for their performance on
this project and hopefully we can use UTS for future
work.
Doug Wilson
Site Co-ordinator
|